DRAFT COMPREHENSIVE WASTEWATER MANAGEMENT PLAN AND DEIR

THIS IS THE DRAFT COMPREHENSIVE WASTEWATER MANAGEMENT PLAN AND DRAFT ENVIRONMENTAL IMPACT REPORT (DCWMP/DEIR) FOR LITTLE POND, GREAT POND, GREEN POND, BOURNES POND, EEL POND AND WAQUOIT BAY WATERSHEDS. THIS DCWMP/DEIR WAS PROVIDED TO THE SELECTMEN ON DECEMBER 14, 2009. LINKS TO EACH CHAPTER AND FIGURE ARE PROVIDED INDIVIDUALLY BELOW IN ORDER TO MINIMIZE THE SIZE OF THE FILES AND SPEED UP DOWNLOAD TIME.

DRAFT TRANSMITTAL LETTER rev
REPORT COVER
EXECUTIVE SUMMARY (With Figures) rev
EXECUTIVE SUMMARY (Without Figures) rev
ACKNOWLEDGEMENTS
ACRONYMS
TABLE OF CONTENTS
CHAPTER 1 - INTRODUCTION
CHAPTER 2 - SUMMARY OF PREVIOUS DOCUMENTS
CHAPTER 3 - PUBLIC PARTICIPATION AND OUTREACH PROGRAM
CHAPTER 4 - WASTEWATER TREATMENT AND WATERSHED NITROGEN BALANCE EVALUATIONS
CHAPTER 5 - CONSIDERATIONS FOR NON-WASTEWATER NITROGEN MANAGEMENT
CHAPTER 6 - SUMMARY OF ENVIRONMENTAL IMPACT ANALYSIS
CHAPTER 7 - RECOMMENDED PLAN
CHAPTER 8 - MEPA DRAFT SECTION 61 FINDINGS AND MITIGATION MEASURES
CHAPTER 9 - NOTICE OF PROJECT CHANGE REQUEST FOR ADDITIONAL ALTERNATIVE PLANS EVALUATED
- Figure ES-1 Location Map
- Figure ES-2 Estimated Existing Wastewater Nitrogen Removal Percentages Required to Meet TMDLs
- Figure ES-3 Estimated Future Wastewater Nitrogen Removal Percentages Required to Meet TMDLs
- Figure ES-4 Proposed MMR Wastewater Treatment Site
- Figure ES-5 Sewer Service Areas for Phases 1 and 2
- Figure ES-6 Recommended Plan Facility Locations
- Figure 1-1 Location Map
- Figure 1-2 Estimated Existing Wastewater Nitrogen Removal Percentages Required to Meet TMDLs
- Figure 1-3 Estimated Future Wastewater Nitrogen Removal Percentages Required to Meet TMDLs
- Figure 2-1 WWTF Sites Considered For Alternatives 1A, 2A and 3A
- Figure 2-2 Potential Infiltration Sites at the Falmouth Country Club Site
- Figure 4-1 Sewer Service Areas for Phases 1 and 2
- Figure 4-2 Expansion of ENR Treatment at Existing Blacksmith Shop Road Site
- Figure 4-3 New ENR WWTF at Falmouth Country Club Site
- Figure 4-4 New ENR WWTF at MMR Site
- Figure 4-5 Otis WWTF Trickling Filter in 1986
- Figure 4-6 Scenario 1c Particle Tracks
- Figure 4-7 Water Worksheet No. 1 (N Balance)
- Figure 4-8 Conceptual Well Layout
- Figure 4-9 Treatment Alternatives Schematic
- Figure 4-10 Proposed MMR Wastewater Treatment Site
- Figure 4-11 Nobska Point Outfall Location
- Figure 4-12 Sludge Management Alternatives
- Figure 4-13 Recommended Plan Facility Locations
- Figure 6-1 Topography Map
- Figure 6-2 Surficial Geology Map
- Figure 6-3 Soils Map
- Figure 6-4 Water Resources and Historic Resources
- Figure 6-5 Habitat Areas
- Figure 6-6 Flood Zone Areas
- Figure 6-7 Open Space and Land Use for Planning Area
- Figure 6-8 Zoning for Planning Area
- Figure 6-9 Proposed WWTF Site


Appendices
1-1 Wastewater Management Vision
1-2 CWMP Plan of Study
1-3 Comment Letters
2-2 CCWPC Report 6-09
3-1 Newsletters.pdf
3-2 Newspaper Clippings
3-3 USEPA Urine Div. Excerpts
3-4 Novaquatis Urine Div. 3-07
3-5 TM Charge for TAG
3-6 Correspondence Outreach & MMR
4-1 BSCE Articles on Outfall 1970s
4-2 Excerpts Sandwich Draft EIS
4-3 Excerpts Otis ANG WWTF Final EIS
4-4  Nitrogen Balance Worksheet for Scenario 3B to Meet Nit
5-1 Tech Memo Fertilizer Mgmt
5-2 Tech Memo SW Mgmt
5-3 Tech Memo Nitrogen Attenuation
5-4 Tech Memo Inlet Modifications
5-5 CCWPC Correspondence
8-1 Falmouth Sewer Cod For New Silver Beach as Growth Mana