Sewer Infrastructure

The Town of Falmouth has selected GHD Engineering, Inc. to plan and prepare a preliminary sewer design for the Little Pond watershed. This design includes a review of the current wastewater treatment facility and discharge sites, as well as environmental assessments. Planning details can be found in Chapter 4 of the September 16, 2014 Final Comprehensive Wastewater Management Plan (CWMP).

Design and permitting are well-underway. For more information on the wastewater collection system for New Silver Beach, please see the Wastewater Department website.